Qlogic QLogic 12000 Series Instalační příručka Strana 31

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 114
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 30
1–Installation
12800-360 Standard Rack Installation
D000102-000 B 1-21
Installation tasks
NOTE:
It is recommended that 12800-360 is installed into the rack at a 5U or 6U
location. This will locate the chassis approximately 12” from the floor and
will allow the chassis to be moved onto the support shelf by sliding off the
pallet. Mark the rack and install clip nuts in the rack holes as shown on the
diagram. There are 24 M6 clip nuts.
1. If applicable, remove the doors of the rack. Install M6 clip nuts in the
following locations on EIA rails for U5 installation. For U6 installation,
increment clip nut locations by one U (1.75”).
Figure 1-17 Clip Nut Installation
Zobrazit stránku 30
1 2 ... 26 27 28 29 30 31 32 33 34 35 36 ... 113 114

Komentáře k této Příručce

Žádné komentáře